Miscellaneous

 
 
Pakistan Steel Mills

Overhauling of Turbo Generators

Complete technical expertise was given to Pakistan Steel for their yearly maintenance of Turbo-Generator. The work included opening, checking, inspection, adjustment and revisioning (where necessary) of Turbo-Generator parts such as bearing, diaphrams, rotor, valves, pumps etc and closing the machines.

Sea Water Pumping Plant Unit No. 5

Installation, testing and commissioning of Pump Unit No.5 with capacity of about 20,000M³/hour and auxiliary equipment such as steel structure, pumps, motors, bridge and total electrical works.

Refractory Works

This Heat insulation work consisting of materials such as Chamotte Alumina Cement, asbestos covering aggregate etc., was completed for 3 boilers of Thermal Power Plant. The work was 25M inside and outside of the main boiler panels. (total tonnage : 1770 tons)

Thermal Power Plant Bin Qasim Units 3 to 5 - 3X210 MW

Supply, fabrication, erection and painting of steel structures (columns, beams, trusses, girders etc.) of Turbine Hall, Workshop and Store Building. (total tonnage : 500 tons)

National Cricket Stadium Karachi

Supply, fabrication, erection and painting of steel structures (columns, beams, trusses, girders etc). (total tonnage : 500 tons)

Piping Bridge at Jamshoro

Installation of Piping Bridge at River Indus for Jamdhoro Power Station.