Pakistan
Steel Mills (2x55 MW)
3
Boilers of 220 tons per hour steam capacity with
100 Kg working pressure and 535°C temperature
with neutralizer plant and accessories.Turbo
Generators of 55 MW each with electrolyser plant
and auxiliary equipment.
Turbo
Blowers with 12 MW each steam turbines for supply
of compressed air for blast furnace.
Complete
electrical installation work.
Pakistan
Steel Mills (1x55 MW)
(Expansion Project)
1
Boiler of 220 ton per hour steam capacity.
1
turbo Generator of 55 MW. Complete electrical
installation work.
Muzaffargarh
(3x210 MW)
Hydrotechnical
System
Central
pump house with 8 Nos. pumps of capacity 15000 M³
per hour each, switching chamber, cooling towers
48 sets, with air output 110,000 M³/hour each,
chlorination plant and complete circulating water
pipe line.
Erection
of 2 Nos. Chimney Stack 200 M High
These
are the tallest structure ever-built in Pakistan
and the work includes prefabrication, assembly,
and erection of 1400 Tones of flues with their
supporting structure alongwith painting (5000M²)
and installation (1000M²).
Complete
Chemical Protection
Sand
blasting, wrapping and coating of CW pipe lines.
Sand
blasting and painting (synthetic and epoxy) of
structures, pipelines, tanks equipment etc.
covering the whole plant.
Rubber
lining of tanks and pipe lines.
Electrical
Works
Complete
electrical works of the plant including 13 Bays
220 kV switchyard consisting of transformers,
circuit breakers, disconnect switches, control and
protection system and cables etc.
Cogeneration
Power Plant, Lahore.
Design.
supply, erection and commissioning of 2X800 kW
congeneration power plant for Sui Northern Gas
Pipeline Head Office Building, Lahore.
Gas
Turbines For Mari Gas
Supply,
installation and compressing of 2X800 kW Gas
Turbines at Dharki for Mari Gas.
|