Transmission Line Experience

ICC has the capability of handling all phases of construction of transmission lines. ICC specialises in the Design, Furnishing of materials, Erection, Testing and Commissioning of a complete Transmission Line System. Todate, over 10,000 Km of Distribution and Transmission Lines ranging from 11 KV to 500 KV have been constructed by ICC. Their highly qualified and experienced engineers, supervisors and technicians are capable of handling all projects in an expeditious manner.

The attached brochure, among other things, gives the information about their key technical personnel and list of transmission line projects completed by them. 

ICC owns two complete sets of tension stringing equipment suitable for 4 Bundle conductor. Details of other tools and plants for survey, tower foundation, tower erection and stringing operations available with them are given in the attached Brochure.

ICC has completed many transmission lines upto 220KV for WAPDA on turnkey basis. Most of the transmission lines upto 220KV in KESC system have been built by ICC on turnkey basis. Even now ICC

RECENT TRANSMISSION LINE PROJECTS

500KV HUB-JAMSHORO TRANSMISSION LINES
In some ways this was a similar project to the proposed Keti Bandar transmission line whereby two independent 500 KV transmission line circuits of 180 KM each were required to be built to connect the private sector 4 x 323 MW Hubco power plant with Jamshoro Hub. ICC collaborated with Saudi Cable Company Marketing of Xenel to jointly secure financing from Islamic Development Bank, and subsequently execute this US 84 million project in a record time.

In the joint collaboration, ICC played a major role of Construction management, which included Design and Engineering; Supply of Tower Paint; Handling, Storage and Inland Transport of all materials; Construction and Commissioning. SCCM supplied Tower, Conductor and Conductor Accessories while Wapda was responsible for supplied of Insulators and Line Hardware.
ICC’s scope of work covered the following:

· Complete Engineering & Design.
· Route Survey and preparation of profile.
· Soil Investigation.
· Inland transportation of plant & equipment from port to site.
· Checking and preparing of material receiving and/or damage reports.
· Storage of Plant and equipment.
· Design and construction of foundations.
· Supply of paint and painting of towers..
· Tower erection.
· Stringing of conductor and Earthwire.
· Testing & Commissioning.

The project was awarded in June, 1994 and the first line was to be completed in a very demanding target of 18 months i.e. by end November, 1995 to coincide with the first power plant unit scheduled to be commissioned in December 1995. The second line was to be completed in 25 months i.e. by end May, 1996. 

ICC accepted the challenge and despite delay in opening of Material letters of Credit by Wapda, the first line was completed ahead of schedule in November 1995. The second line was completed in October 1996, the delay being caused by Wapda’s inability to get clearance of imported materials due to non-availability of funds.

The line was built using galvanised steel lattice towers. Over sixty percent of galvanised towers, located in the polluted area were treated with epoxy based paint with a guarantee against corrosion of fifteen years and a life expectancy of paint for twenty years. Stainless steel hardware was used for the entire line length and stringing  was carried out by utilizing tension stringing methods using four bundles of 470mm2 All Aluminium Alloy Conductor per phase.

Here, we consider it worthwhile to mention that ICC was also responsible for the Mechanical Installation of the four Turbines and Generators, Pipelines and Power Plant Electrical Works for HUBCO as a subcontractor to Ansaldo Spa of Italy. 

KESC 220 KV & 132 KV TRANSMISSION LINES 
6th Power Project
KESC Sixth Power Project Overhead Lines were awarded to us on 2nd June, 1996. The project is financed by Asian Development Bank. The job is on turnkey basis comprising of design, survey soil investigation, civil works, painting, erection, stringing and commissioning of 83 KM of 220 KV and 97 KM of 132 KV Transmission Lines

ICC was the only Pakistani company qualified to Bid for this project which was awarded against International Competitive Bidding.

The project completion time is 23 months. Some of the lines to which private power plants are to be connected were to be completed within 7 to 9 months time, which ICC took it as a challenge and all geared up to complete these lines in stipulated time to avoid penalty to the Customer.

Project Client Km Year
500 KV
2nd Multan - Gatti WAPDA 222 1995
3rd Guddu - Multan Section 1 and 2 WAPDA 310 1994
Tarbela - Peshawar WAPDA 118 1992
2nd Guddu - Multan Section WAPDA 122 1991
Terbela - Gatti Section-2 WAPDA 147 1985
Guddu - Jamshoro Section-1 WAPDA 181 1983

Tarbela - Faisalabad South Section

WAPDA

150

1977

RSK Dam - Omediya 400 KV Stringing

Iran

160

1978

220 KV

 

 

 

Lot F Turnkey Project

KESC

40

1993
Multan - Kot Addu Tower Erection, Stringing WAPDA 64 1989
Multan - Kot Addu Foundations only WAPDA 40 1985
Lot 6D1 Turnkey Project KESC 29 1985
Lot 6B Turnkey Project KESC 43 1984
Tarbela - Mardan WAPDA 60 1982
Mangla - Wah WAPDA 150 1976
Terbela - Burhan 2X37 Km WAPDA 74 1976
Kala Shah Kaku - Nishatabad WAPDA 120 1971
Kala Shah Kaku - Kot Lakhpat WAPDA 61 1970

Mangla - Kala Shah Kaku

WAPDA

115

1970

132 KV

 

 

 

Lot T002 Turnkey project KESC 30 1993
RECP-North Karachi Turnkey Project KESC 3.5 1993
Lot 6D 2 Turnkey Project KESC 23 1986
KEPZ Turnkey Project KESC 3 1985
Attock Cement Turnkey Project

Attock Cement

12 1985
Hub Chowki-Bela (PCC-Poles) KESC 150 1982
Pakistan Steel Turnkey Project Pakistan Steel 6 1980
Quetta-Muslim Bagh WAPDA 150 1979
Indus River Crossing Guddu Single Span WAPDA 1.7 1972
Indus River Crossing Taunsa Single Span WAPDA 1.7 1972
Valika -Landhi- Gulshan Turnkey Project KESC 45 1972
Ludewala - Bhamb Turnkey Project WAPDA 100 1972
SCARP-3 Turnkey Project WAPDA 24 1971
Kanupp - Valika Turnkey Project KESC 134 1970
Dharki - Rohri 2nd Circuit Stringing

WAPDA

108 1969
Bahawalpur - Dharki 2nd Circuit Stringing WAPDA 290 1969
SCARP-2A Turnkey Project WAPDA 96 1968
Landhi - Dhabeji KESC 33 1968
Sukkur Thermal Power Project Stage II WAPDA 100 1967
Rawalpindi - Islamabad Turnkey Project WAPDA 20 1962
Rawalpindi - Kharian Turnkey Project WAPDA 140 1961
Wah - Rawalpindi Turnkey Project WAPDA 45 1960

Warsak - Wah Turnkey Project

WAPDA

145

1960

66KV

 

 

 

Valika-Landhi-Gulshan Turnkey Project

KESC

10

1972
Sukkur Thermal Power Project Stage-II WAPDA 100 1967
Sukkur Thermal Power Project Stage-I WAPDA 240 1965
Quetta Area Turnkey Project WAPDA 64 1964
Northern Thal Area Turnkey Project WAPDA 350 1963
Lyallpur-Jang Thal Area Turnkey Project WAPDA 336

1963

 

Hyderabad Area WAPDA 288

1962

33/11 KV

 

 

 

SCRAP-2a Turnkey Project WAPDA 1360 1967
Sukkur Thermal Power Project Stage -II WAPDA 317 1967
Quetta Area Turnkey Project WAPDA 224 1964
Secondary Grid Turnkey Project WAPDA

835

1963
Hyderabad Area WAPDA 280 1962